top of page
Visit to the Garnich wind farm (Soler) and the SES (Syndicat des Eaux du Sud)
Visit to the Garnich wind farm (Soler) and the SES (Syndicat des Eaux du Sud)

Fri, 25 Mar

|

Garnich

Visit to the Garnich wind farm (Soler) and the SES (Syndicat des Eaux du Sud)

One of the most recent wind turbines in Luxembourg in the SES basin and its photovoltaic plant.

Registration is closed
See other events

Zäit & Standuert

25 Mar 2022, 15:00 – 17:00

Garnich, Garnich, Luxembourg

Iwwert den Evenement

This is a double visit. First, Paul Zeimet from the Soler team, the largest wind turbine operator in Luxembourg, welcomes you at the foot of the "Um Réibierg" wind turbine next to the SES site and presents the Soler company, its activities in the development, construction, operation and repowering of wind farms, and this not without dwelling on the analysis and management of the environmental and human impact. Then Luc Berens from the Syndicat des Eaux du Sud will show you the drinking water basin next door, with its photo-voltaic panel installation.

Please note that for coding reasons on this website, the location on the map does NOT correspond to the meeting place! Meet at the foot of the wind turbine "Um Réibierg" at 3pm for a double visit of about two hours.

-> Take the CR106, between Garnich and Kahler. A precise map will be sent to the registrants.

Share this event

bottom of page